Overgrown brush, rotting floors, collapsing roofs, vermin and asbestos.

Dealing with deteriorating structures isnโ€™t a new issue for the town of Franklin, but the slow legal process has the town board wondering if there is a more efficient way to handle the growing problem.

The town has a Minimum Housing Standards ordinance that allows Town Planner Justin Setser to take action when a dwelling is believed to be unfit for human habitation, but the process is long and arduous. Formal complaints need to be filed, inspections have to be done and property owners have to be located before the town can even start the process of getting the property cleaned up.ย 

Mayor Bob Scott said heโ€™s been exploring several areas of Franklin that heโ€™s never seen before and finding the dilapidated house problem is more prevalent than the town realizes.ย 

โ€œWeโ€™ve got literally a couple of dozen places that are as bad or worse than this place is โ€” some of these places are dangerous,โ€ he said, referring to a Pauline Avenue home.ย 

Based on board consensus in the past, Setser has been addressing out-of-compliance homes on a complaint-driven basis. Setser wonโ€™t begin the mitigation process unless he has five letters from residents complaining about the same property, but Scott suggested taking on a more proactive role in cleaning up these properties.

Scott said requiring five complaint letters could be burdensome for neighbors who may fear repercussions for expressing concern for someone elseโ€™s property.ย 

โ€œNeighbors might think they canโ€™t do anything without a formal letter,โ€ he said. โ€œNo one is in a better position to judge this type of thing than Justin.โ€

Alderman Barbara McRae said Scott made a good point and that she hadnโ€™t thought about neighbors being fearful of coming forward to complain.ย 

โ€œIโ€™m with you as long as weโ€™re careful about it and it doesnโ€™t look like were persecuting people,โ€ she said.ย 

Alderman Billy Mashburn said he would be opposed to a more proactive approach to the ordinance. He said having five people write a complaint prevented the appearance of the town going after peopleโ€™s property for no reason.ย 

โ€œWe donโ€™t want to task him with tracking down dilapidated houses โ€” he has other things to do,โ€ he said.ย 

Setser said he also preferred the five-complaint approach to give the process legitimacy as opposed to making the decision by himself. But that doesnโ€™t mean he doesnโ€™t have the authority to take action in specific circumstances.ย 

โ€œIf I canโ€™t get five letters and there is obviously a problem, I can take action โ€” itโ€™s just a slow process,โ€ he said. โ€œLetโ€™s not change the ground rules โ€” letโ€™s just work on educating people.โ€

Setser had come before the board on Jan. 3 to address a specific Minimum Housing Standards violation at 456 Pauline Avenue. He received five complaints regarding the property last summer and began the process of issuing a violation notice based on the exterior conditions. He visited the vacant house in late June and found deteriorating conditions making it unfit for human habitation.ย 

He tracked down the owner in Florida and sent him a letter to appear at a July 20 public hearing in Franklin to discuss the violation and how to bring it into voluntary compliance.ย 

โ€œThere was a lot of overgrowth โ€” the property owner said he hasnโ€™t been to it in 20 years,โ€ Setser said. โ€œWe requested he clean the brush off around the house and fix the caved in roof and deteriorating porch.โ€

The homeowner complied and hired a contractor to do the clean-up work within 90 days as required by the townโ€™s ordinance. However, when the contractor entered the inside of the home, more problems were found.ย 

โ€œThatโ€™s when the contractor found parts of the floor was missing โ€” you can see through to the crawl space โ€” so that turned the house into a dilapidated state,โ€ Setser said.ย 

At that point, the property owner decided it would be best to tear the house down. He went through the county to obtain asbestos removal and demolition permits, but later found out that the high amount of asbestos in the house will cost more than $8,000 to remove in addition to $15,000 for demolition and landfill costs.ย 

โ€œThe owner is now refusing to tear it down โ€” heโ€™s going to refuse to fix the floor and the roof so now itโ€™s at a standstill and his 90 days are up,โ€ Setser said.ย 

Town Attorney John Henning Jr. said the No. 1 goal is always to work out the compliance issues voluntarily before taking the matter to court.

โ€œJustin does a good job trying to make sure we have voluntary compliance, which is why it takes so long,โ€ he said. โ€œBut the involuntary process is going to be necessary at this point.โ€

Henning said the town could file suit against the property owner to order him to fix the property or file suit against the property itself. That latter option takes longer but the end result can allow the town to move forward with demolition. The town could then put a lien against the property for the cost it incurred and pursue reimbursement in civil court.ย 

Both options are being considered, but the board took no formal action on the issue.ย